Prevention and control measures for safe production of high support formwork engineering
the characteristics of high support formwork engineering are high risk and easy to cause mass death and injury. It also refers to formwork and support fragments with a height of more than 8 meters, a span of more than 18 meters, or a total construction load greater than 10kn/m
it is compatible with the technical requirements caused by
1. Before the construction of high support formwork project, the construction organization design of high support formwork project must be targeted according to the requirements of the design documents. For projects with high risk, the chief engineer of the company must organize relevant experts to stop on-site inspection and demonstration. The construction organization design must include the following contents:
1.1 the person in charge of the project technology according to the design, The scope of use of the material testing machine is no longer limited to the metal and other fields. The prevention methods for the key links of the construction safety. The requirements for the safe operation of the high support formwork project construction, contact the characteristics of the project, organize professional technicians to strictly follow the relevant national standards, standards, procedures, and the special construction scheme of the high support formwork project
1.2 the construction scheme of the high supported formwork project must have the check calculation sheet and construction drawings, the certificate of conformity of components and fittings, the support system must have sufficient bearing capacity, and the degree support and cross bracing should be set. The installation of devices, the abolition of construction technology and construction methods, targeted Enron technical methods, and the Enron construction emergency plan must be strictly formulated. We should strictly abide by the approval procedures and perfect the signing procedures
2. Before the implementation of the construction scheme of high support formwork engineering, the technical person in the unit shall organize more than three experts and other relevant departments to stop the demonstration and review of the special construction scheme, and the implementation can be organized before the review is qualified. Before construction, the person in charge of the project technology should stop the Enron technology disclosure to the operating staff. Plastic flexible packaging is the main application field of composite polyurethane adhesive, and the construction can be carried out only after signing the Enron technology disclosure card
3. During the installation of high support formwork engineering, the scheme designer and the person in charge of engineering project technology should stop checking the device quality of each process. After the installation of the device is completed, organize relevant personnel with the supervision unit to stop inspection and acceptance. After the acceptance is qualified, the technical person in charge of the unit and the chief supervision engineer of the supervision unit shall sign for confirmation before pouring concrete or stopping the layout of component devices. During concrete pouring or component installation, special personnel must be assigned to stop monitoring the fragmented deformation of formwork support
4. When the high support formwork project is cancelled, the strength of the layout components must meet the formwork removal strength required by the construction friction pair is the round set sample scheme, and meet the relevant standard requirements. The formwork can be cancelled only after it is approved by the technical person in charge of the unit and the chief supervision engineer of the supervision unit. A warning area shall be set up and supervised by a specially assigned person
5. In case of construction safety accidents caused by the construction of high support formwork works, it should be timely and timely stated to the supporting administrative department, the construction safety supervision organization or other relevant departments, and effective measures should be taken to deal with them in time to prevent the situation from expanding
6. During the construction of high support formwork, the whole construction process shall be recorded